
Front steps and a curved walk for a Midtown bungalow
A craftsman bungalow with cracked steps and a narrow broken path. We took the whole entry out and rebuilt it as one continuous sweep.
Driveway · Memphis, TN
A section of failed driveway torn out in front of the garage and re-poured, then the whole run finished as washed exposed aggregate.
Before / after


The job
The apron in front of the garage had gone. On a driveway this size that is the section that takes every turning wheel, and once it starts breaking up it takes the panels either side of it with it.
We broke out the failed area back to a clean edge and down to bare soil, re-graded and compacted the base, and set rebar through the new section so it is tied to what stays.
Washed exposed aggregate across the run. The paste is hosed off at exactly the right moment: too early and the surface is ruined, too late and the stone never shows. That timing is the whole job.
Photo record







More work

A craftsman bungalow with cracked steps and a narrow broken path. We took the whole entry out and rebuilt it as one continuous sweep.

A narrow, cracked driveway running up a slope, replaced with a wide washed aggregate slab that changed the whole front of the house.
Next step
Call or text (469) 334-7552. We come out, measure the job and give you a free estimate with no obligation.